Client Challenge
Amway, a global leader in health and beauty products, required an upgrade to their main water softening system at their XS liquids building. The existing system was a critical component in their production line, serving as a pre-treatment stage for the reverse osmosis system that is integral to the production of their popular energy drinks. Amway needed a solution that would allow them to replace the system without disrupting their tight production schedules.
Besco Solution
Besco Water Treatment was tasked with the challenge of replacing Amway’s water softening system with minimal impact on production. We designed a 1.2M grain twin alternating system that would provide the necessary capacity and reliability for Amway’s operations. To ensure a seamless transition and continuous production, we collaborated with Hunter Prell, our trusted contractor, to implement a strategic installation plan. The plan involved setting up one tank to be operational while the second tank was being installed, thus eliminating any downtime for Amway’s production line.
The result was a flawless installation that did not interfere with Amway’s energy drink production. Besco Water Treatment’s commitment to listening and responding to our customer’s needs was evident in the successful execution of this project. Amway was able to continue their operations uninterrupted, thanks to the new water softening system that now reliably serves as a pre-treatment for their critical reverse osmosis system.