ClickCease
Water Treatment Company Muskegon, MI

Your DI Headquarters

Customer Reviews

Wanted to let you know the new water system is working great. No issues at all. I also wanted to let you know what a great job Will did. Very thorough and conscientious. From start to finish including labeling everything so I knew what was what, answering all my questions, and cleaning up the work area when he was done, he took his time and did it right. Please pass my appreciation on to him.

Rick, Pace Analytical Services 3/1/17

Your guys did an excellent job yesterday on the softener installation. They got us back on soft water before they left for the day. I left before they did so I don’t know the exact status of the job. I was wondering if they are coming back today to finish up and I wanted some info on how the softener regenerations are set up. I would also like them to review the operation with a couple of my operators.

Richard B., Women’s Huron Valley Correctional Facility 7/13/15

Hi Ken, Thanks for following up. The system is working well. Your technicians provided us with excellent service during the installation process.

Ohiole A., Continental Structure Plastics 7/13/15

Free Consultations

Free Consultations

Featured Case Study

Client: ODL, Inc. (Ottawa Door Lights) Zeeland, Michigan

Ottawa Door Lights’ Ultra Pure Water System
Ultra Pure Water system for manufacturing
Ultra Pure Water System
Client Challenge: ODL, Inc. is a world-wide manufacturer of door glass and door glass frames, and was founded and is still headquartered in Zeeland for the past 70 years. ODL was experiencing problems in their glass washing process at their Zeeland manufacturing and distribution center. With double-pane windows there cannot be any residue or spotting on them before shipping. Being a world-wide leader in door glass and frames all products have to ship in perfect condition. Besco Solution: Besco analyzed the problem ODL was experiencing and devised a strategy that included ultra-pure water for the rinsing process. The challenge was fitting all of the necessary equipment into a very small footprint. In order to accomplish this, Besco recommended that a mezzanine be constructed in the manufacturing facility to hold the permeate storage tank for the ultra-pure water. ODL agreed, and the system was installed. As a result, the look and quality of their product has dramatically increased. In fact, ODL was so impressed with the way their door glass looked and its quality presentation value that they ordered another similar system designed by Besco Commercial Water Treatment for their manufacturing facility in Mexico.
Check out the rest of our Case Studies!

What Do Our Customers Say?

Previous Next