Lima, Peru | Website
Client Challenge
Besco Solution
Besco has experience with this type of installation so the added security and assembly requirements could be met while ensuring that the United States would be pleased with the system. Besco won the bid on this project based on cost, reputation and the ability to do this type of “remote installation”. So Besco engineered and assembled the system with the manufacturer at their facility in Doral, Florida. After assembly, it was shipped to the jobsite at the Embassy in Lima, Peru. It was then installed by Peruvian contractors cleared for high security. Once installed, a Besco qualified service technician flew to Peru to perform the programming, start-up and training of the Embassy workers on how to operate the system.
The U.S. Government officials at the Embassy were ecstatic at the level of communication and the smooth and efficient operation of the new filtration and water softener system. They were totally satisfied with the completed project.
