ClickCease
Water Treatment Company Muskegon, MI

Your DI Headquarters

Terms & Conditions

By using this website, you agree to have read and agreed to the following terms and conditions:

This site is operated from the Besco Water Treatment, Inc. headquartered in Battle Creek, Michigan. Although this website can be accessed worldwide, you agree that by using this site, you will abide by all applicable laws of the State of Michigan pertaining to the use of this site.

The information and graphics within this website are the exclusive property of Besco Water Treatment, Inc. and users are not permitted to reproduce, modify or republish this content without receiving prior written permission from Besco Water Treatment, Inc. The information provided on this site is done so without warranty and Besco Water Treatment, Inc. will not be held responsible for any damages or injuries inflicted by the use of this website.

Besco Water Treatment, Inc. reserves the right to modify and update these terms and conditions at any time.

These terms and conditions establish an agreement between you, the user and Besco Water Treatment, Inc. By accessing this website, you agree and accept the terms and conditions and their entirety.

Free Consultations

Free Consultations

Featured Case Study

Client: Henry Ford Health System - Detroit, Michigan

Client Challenge: With 6 hospitals and 103 ambulatory facilities Henry Ford Health System has 15,374 employees and about 5 billion dollars in revenue. With an operation of this size in a “life and death” environment, all computers must run 100% of the time and with no failure. As part of their strategy for no downtime, Henry Ford Hospital Data Center had the need for a high purity system for ultrasonic humidification. Since data centers are required to maintain a controlled environment with specific humidity for the operation of their hard drives and data storage devices, the quality of the air in the data center is critical. Any impurities in the air can create dust and that can lead to the eventual failure of critical systems. Besco Solution: Designing and installing a high purity system for ultrasonic humidification is a core competency of Besco Commercial. We have done it before and understand the critical nature of the application and the need for precision. The real challenge at Henry Ford, and one that Besco faced at Chase Bank too, was the small space that the installation had to fit into. Besco Commercial was given a footprint that was approximately 4’ in depth. However, just as at Chase, we were able to manipulate the equipment to fit this small area and provide the humidification requirements that the Health System needed for a successful installation.
Check out the rest of our Case Studies!

What Do Our Customers Say?

Previous Next